Search
 
tecor - cima 001
 
Home \ News
JPCL - April 2002 magazine

Advances in High Production Robotic Water jetting for the Marine Industry

(...)

" The Jamestown was the first vessel in LIsnave to have the underwater hull and topsides areas treated with a UHP robotic device.

(...)

The surface preparation for the Jamestown's topsides (LLL to Maindeck) called for full sweeping (WJ-4). The underwater hull specified a total coating removal (WJ-3 minimum). "

 
site map | privacy policy | web design webuild | Copyright © 2007 TECOR Tecnologia Anticorrosão, S.A.