Search
 
Tecor - CBode
Descarregador_nr_3_Carrapatelo1
Regua_Hidroelectricas
Barragem1
Carrapatelo10r
Descarregador nr. 3_Carrapatelo2
 
Home \ Customers \ Portugal Electricity Company
Hydroelectric Systems
  • Zêzere" river, 2000 - “Castelo de Bode” flood spillway gate

Repair, hydroblasting and painting.


  • “Douro” River, 1998/99 - Hydroelectric-power plants

                Mechanical repair and painting of:

    •  the Régua, Carrapatelo and Crestuma Navigation Locks, as well as;

    •  the Carrapatelo dam flood spillway gate.

Several preparation and painting work on surfaces, plates, piping and structures into contact with water, are subject to condensation, embedded in concrete, exposed to open air and also degreasing and washing of oil contaminated surfaces.

 
site map | privacy policy | web design webuild | Copyright © 2007 TECOR Tecnologia Anticorrosão, S.A.